Production & quality

One chain, from glass fiber yarn to a closed container.

Weaving, coating, slitting, tube cutting and packing sit in the same plant. That is what makes a specification change an internal adjustment rather than a supplier negotiation — and what makes the loading plan something we can verify before the truck leaves.

Production chain

Four stages we run ourselves.

Each stage has its own check before the next one starts. If a roll fails a check, it is caught before it becomes a packed carton — not after it becomes a claim.

Glass fiber mesh fabric weaving
Step 01

Weaving

Glass fiber mesh fabric woven to the warp and weft counts fixed by the product specification, then inspected for mesh regularity.

Two-pass coating line for fiberglass mesh
Step 02

Two-pass coating

A sizing (hard) coat stabilises the weave, then a pressure-sensitive adhesive coat makes the tape self-adhesive. Two oven zones, roughly 26 m and 14 m.

High-speed slitting and rewinding of mesh tape
Step 03

Slitting & winding

Master rolls slit to width with dual-shaft winding, so rolls arrive tight and even on the paper core instead of loose at the outside.

Export cartons counted and stacked before loading
Step 04

Shrink-wrap & carton

Label and shrink wrap per roll, then a neutral or printed export carton counted against the packing list before loading.

2coating passes per roll
~40 mcombined oven path length
Dual-shaftslitter winding
Per orderloading plan calculated

Equipment

Machines built for this product, not adapted to it.

The slitting, tube-cutting and packing equipment was developed and modified around the handling behaviour of coated fiberglass tape, and has been proven in high-volume production.

High-speed slitting machine for fiberglass mesh tape
High-speed slitting machine
DesignDeveloped in-house for coated fiberglass mesh master rolls
FunctionSlitting and rewinding in one pass
WindingDual-shaft, tension-controlled
UnwindMechanical shaft for large-diameter master rolls
OperationSingle operator for roll changing and monitoring
Reference outputApprox. 15,000 m per 12-hour run
CNC single-spindle paper tube cutting machine
CNC tube cutting machine
ControlPLC with touch-screen HMI; multi-language interface
CuttingServo synchronous tracking, tungsten carbide single blade
Accuracy≤ 0.15 mm
Cut length5–1700 mm
Tube inner diameter50–152 mm
Wall thickness1–20 mm
Speed1 cut per second
Power / air380 V 3-phase 50 Hz · 0.6 MPa
Footprint / weight2500 × 650 × 1220 mm · 900 kg
Automatic L-sealer shrink wrapping machine
Automatic L-sealer shrink wrapper & tunnel
ParameterL-sealerShrink tunnel
ModelSF-400LA / SF-400LACSF-4525
Power2.2 kW · AC 220 V 1-phase9 kW · AC 380 V 3-phase
Max pack sizeL+H ≤ 530 mm, W+H ≤ 430 mm, H ≤ 135 mm1000 × 300 × 200 mm
Speed15 m/min0–20 m/min
FilmPOF shrink film, with anti-stick PTFE-coated sealing blade and automatic scrap take-up

POF film and other consumables can be shipped in the same container as your order, so a buyer does not have to source packing material locally before starting production.

Quality & testing

Documented values, on request.

In-house checks run at four points in the chain. Where a buyer or a standard requires third-party proof, the report is issued for the construction actually shipped.

In-house checkpoints

  • Incoming material — yarn count, mesh fabric weight and appearance against the approved reference.
  • Coating — adhesive pick-up and drying checked against the agreed finished weight.
  • Finished roll — width, length, weight, winding tightness, roll diameter and core fit.
  • Packing — label, shrink wrap, carton count and loading plan verified before the container is closed.

Third-party testing

Alkali resistance, tensile strength, elongation and unit mass are tested by accredited laboratories when a buyer requires it. Test reports and technical data sheets are shared for the specific construction on order — we do not forward a report for a different product.

Quality control testing of fiberglass mesh
Reference test data — alkali-resistant mesh fabric
PropertyStandardTested value
Mass per unit area≥ 130 g/m²162 g/m²
Alkali-resistant tensile, warp≥ 750 N/50 mm882 N/50 mm
Alkali-resistant tensile, weft≥ 750 N/50 mm1,134 N/50 mm
Tensile strength retention, warp≥ 50 %52 %
Tensile strength retention, weft≥ 50 %53 %
Elongation at break, warp≤ 5.0 %3.8 %
Elongation at break, weft≤ 5.0 %4.0 %

Tested construction: coated alkali-resistant mesh fabric, nominal 160 g/m², 4 × 4 mm opening, 100 tex warp and 500 tex weft. Report Z180419018, Hebei provincial construction-materials testing station. All seven values were judged conforming. Values apply to this construction only; other constructions are tested separately.

Strength values are not extrapolated between products. A different mesh opening, yarn count or coating weight changes the result, so each construction is measured rather than estimated.

Packing & loading

Loaded to the measured carton.

Container fill is decided by carton outside dimensions, roll diameter and the loading arrangement. We calculate it for your order instead of repeating a figure from an earlier shipment.

Export cartons being loaded into a container
Loading reference — past shipment record
Carton used460 × 310 × 320 mm (reference standard box)
Container40HQ
Cartons loaded1,520 cartons
ConditionSpecific carton, roll count and customer packing; not a guaranteed figure

Every new order is re-calculated from the confirmed carton size, pallet or floor loading and mixed-SKU plan, then verified when the container is packed.

How the loading plan is built

  1. Confirm the carton

    Outside dimensions, board grade, gross weight and whether the carton travels on a pallet.

  2. Calculate the arrangement

    Cartons are tested in the available loading positions against the container's internal dimensions, allowing for door height and floor condition.

  3. Fix roll count and packing

    Rolls per carton and per pallet are locked so the packing list, carton count and container plan agree.

  4. Verify at loading

    The packed container is checked against the plan; documents are issued from the verified count.

No fixed quantity promise: we quote a loading quantity only after the carton and packing are confirmed. Historical figures from other customers are references, not contract terms.

Export service

Documents, terms and one person to talk to.

Export is handled in-house: quotation, proforma, production, inspection, loading and the document set your bank or customs broker expects.

Incoterm

FOB Tianjin Xingang

Our default quotation basis. Other Incoterms are quoted on request, with freight re-checked on the day rather than carried over from an old offer.

Documents

Full export set

Commercial invoice, packing list, certificate of origin and inspection documents. Additional certification or legalisation is arranged when the destination needs it.

Language

English documentation

Offers, specifications, packing lists and labels are issued in English. Chinese-language documents are available for domestic clearance purposes.

Standard commercial terms — first order
ItemStandard positionNotes
IncotermFOB Tianjin XingangOther terms quoted on request
PaymentT/T — 40 % deposit, 60 % before loadingNo open account terms for new buyers
Quotation validity5 daysStart and end dates are printed on the offer
SamplesSample and freight on the buyer, creditable against the first orderCredit ceiling agreed in writing before dispatch
Lead timeConfirmed after quantity, artwork and depositProduction dates are confirmed in writing, not estimated
Labels & conformityBuyer provides destination requirementsConformity path confirmed with your importer before production

These are the standard positions for a first order. They are stated here so that there is no surprise at the proforma stage — final terms are confirmed in the offer.

Development pipeline

What is not for sale yet.

Buyers deserve to know the difference between a product we ship every week and one we are still validating. These are in development and are not quoted as standard products.

Validation

~120 gsm outdoor system tape

Under sample validation for outdoor cement-board systems. Until the validation closes, the 70 gsm reference tape is not offered as a substitute for a system-approved outdoor tape.

On request

Special constructions

Unusual mesh openings, colours, widths and adhesive levels are assessed case by case. If a construction sits outside our process window, we say so before sampling.

The plant

Where the material is made.

Weaving floor, coating line, slitting department, packing area and finished-goods store — the whole sequence at one site in Tianjin, China.

Production floor
Finished goods warehouse
Container loading area
Production and export team

Want to check a specific capability?

Send the construction and the volume you have in mind. We will confirm what the line can hold, what the carton will be, and what the loading looks like.